*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AEROSPACE COMPONENTS
NAICS
n/a
SIC 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $464,412 6,559,496
kWh
Natural Gas $25,005 5,588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $91,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $27,958 $5,100 $27,958
389,801
kWh
02 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $12,409 $30,000 $12,409
186,401
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,189 $2,775 $1,189
16,706
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,153 $1,500 $5,153
72,685
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,472 $1,100 $1,472
20,809
kWh
06 2.6232: Install set-back timers $2,580 $2,325 $2,580
36,342
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,326 $50,000 $1,326
18,757
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $691 $550 $691
9,672
kWh
09 2.4133: Use most efficient type of electric motors $448 $515 $448
6,448
kWh
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $521 - $521
7,327
kWh
11 2.8114: Change rate schedules or other changes in utility service $37,471 $100,000 $37,471
-
kWh
TOTAL RECOMMENDED $91,218 $193,865 $91,218
764,948
kWh
TOTAL IMPLEMENTED $91,218 $193,865 $91,218
764,948
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs