| Assessment Year | 1991 |
|---|---|
| Principal Product | AEROSPACE COMPONENTS |
| NAICS |
n/a
|
| SIC | 3769: Guided Missile Space Vehicle Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $464,412 | 6,559,496 |
kWh
|
$0.071 |
| Natural Gas | $25,005 | 5,588 |
MMBtu
|
$4.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $91,218 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $91,218 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $27,958 | $5,100 |
$27,958
389,801
kWh
|
|
| 02 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $12,409 | $30,000 |
$12,409
186,401
kWh
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,189 | $2,775 |
$1,189
16,706
kWh
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,153 | $1,500 |
$5,153
72,685
kWh
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,472 | $1,100 |
$1,472
20,809
kWh
|
|
| 06 | 2.6232: Install set-back timers | $2,580 | $2,325 |
$2,580
36,342
kWh
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,326 | $50,000 |
$1,326
18,757
kWh
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $691 | $550 |
$691
9,672
kWh
|
|
| 09 | 2.4133: Use most efficient type of electric motors | $448 | $515 |
$448
6,448
kWh
|
|
| 10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $521 | - |
$521
7,327
kWh
|
|
| 11 | 2.8114: Change rate schedules or other changes in utility service | $37,471 | $100,000 |
$37,471
-
kWh
|
|
| TOTAL RECOMMENDED | $91,218 | $193,865 |
$91,218
764,948
kWh
|
||
| TOTAL IMPLEMENTED | $91,218 | $193,865 |
$91,218
764,948
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs