ITAC Assessment: AR0157
ITAC logo
ITAC Assessment: AR0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Architectural precast panels
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 32,500
ft2
Annual Production 450
thousand feet
Production Hrs. Annual 3,978
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,120 776,671
kWh
Electricity Demand $5,718 2,508
kW-mo/yr
Natural Gas $36,880 7,042
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $379

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $972 - - - $972 - -
02 2.4221: Install compressor air intakes in coolest locations $379 $100 $346
5,275
kWh
$33
-
kW-mo/yr
- - -
03 2.7261: Install timers and/or thermostats $2,437 $875 $2,437
136,284
kWh
- - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $1,683 $5,500 $(-2.0)
(-293)
kWh
- - $1,929
-
lb
$(-244.0)
05 3.2176: Increase use of automation $4,965 $92 - - - - $4,965
06 4.446: Automate finishing process - $2,775 - - - - -
07 3.2176: Increase use of automation - - - - - - -
TOTAL RECOMMENDED $10,436 $9,342 $2,781
141,266
kWh
$33
-
kW-mo/yr
$972 $1,929
-
lb
$4,721
TOTAL IMPLEMENTED $379 $2,875 $346
5,275
kWh
$33
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs