ITAC Assessment: IC0162
ITAC logo
ITAC Assessment: IC0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Architectural Paint Colorant
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $100
M
to 500
M
# of Employees 206
Plant Area 154,800
ft2
Annual Production 3,000
Tgal
Production Hrs. Annual 8,520
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $496,091 7,054,518
kWh
Electricity Demand $93,969 18,921
kW-mo/yr
Electricity Fees $9,018 -
Natural Gas $254,042 26,485
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,743

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,382 $22,982 $8,350
119,323
kWh
$1,003
-
kW-mo/yr
$2,234 - $(-205.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,659 $1,839 $903
12,855
kWh
$205
-
kW-mo/yr
$551 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,541 $54,496 $13,897
198,525
kWh
$1,551
-
kW-mo/yr
$(-3,439.0) $1,532 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,295 $1,754 $1,246
17,801
kWh
$119
-
kW-mo/yr
$3,250 - $680
05 2.4133: Use most efficient type of electric motors $14,810 $35,989 $12,878
183,974
kWh
$1,932
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,070 $2,415 $11,070
158,139
kWh
- - - -
07 2.6211: Conserve energy by efficient use of vending machines $646 - $378
5,400
kWh
$268
-
kW-mo/yr
- - -
08 2.2437: Recover waste heat from equipment $5,540 $823 $5,540
573
kWh
- - - -
TOTAL RECOMMENDED $63,943 $120,298 $54,262
696,590
kWh
$5,078
-
kW-mo/yr
$2,596 $1,532 $475
TOTAL IMPLEMENTED $48,743 $63,963 $39,462
485,210
kWh
$3,322
-
kW-mo/yr
$5,484 - $475
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs