ITAC Assessment: AM0068
ITAC logo
ITAC Assessment: AM0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product RING GASKETS,BOLTS,NUTS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 127
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,342
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,183 4,791,911
kWh
Natural Gas $159,781 33,770
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,387 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,387

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $40,430 $24,600 $(-3,180.0)
(-79,132)
kWh
$43,610
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $9,210 $16,500 $9,210
403,869
kWh
-
03 2.6232: Install set-back timers $2,180 - $2,180
81,770
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $890 $1,000 $890
33,118
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $347 $97 $347
7,034
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $330 $295 $330
12,309
kWh
-
TOTAL RECOMMENDED $53,387 $42,492 $9,777
458,968
kWh
$43,610
-
MMBtu
TOTAL IMPLEMENTED $53,387 $42,492 $9,777
458,968
kWh
$43,610
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs