Assessment Year | 1989 |
---|---|
Principal Product | RING GASKETS,BOLTS,NUTS |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 127 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,342
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $221,183 | 4,791,911 |
kWh
|
$0.046 |
Natural Gas | $159,781 | 33,770 |
MMBtu
|
$4.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,387 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,387 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $40,430 | $24,600 |
$(-3,180.0)
(-79,132)
kWh
|
$43,610
-
MMBtu
|
|
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $9,210 | $16,500 |
$9,210
403,869
kWh
|
- | |
03 | 2.6232: Install set-back timers | $2,180 | - |
$2,180
81,770
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $890 | $1,000 |
$890
33,118
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $347 | $97 |
$347
7,034
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $330 | $295 |
$330
12,309
kWh
|
- | |
TOTAL RECOMMENDED | $53,387 | $42,492 |
$9,777
458,968
kWh
|
$43,610
-
MMBtu
|
||
TOTAL IMPLEMENTED | $53,387 | $42,492 |
$9,777
458,968
kWh
|
$43,610
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs