ITAC Assessment: UM0469
ITAC logo
ITAC Assessment: UM0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Hot End exhaust (manifold and catalytic converters)
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 109,000
ft2
Annual Production 300,000
units
Production Hrs. Annual 3,840
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,135 1,827,140
kWh
Natural Gas $42,995 6,524
MMBtu
TOTAL YEARLY COSTS $195,130
RECOMMENDED SAVINGS* $15,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,139 $1,000 $2,139
25,771
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $2,118 $5,200 $438
5,222
kWh
$1,680
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $7,961 $20,000 - $7,961
-
MMBtu
04 2.2437: Recover waste heat from equipment $2,415 $1,500 - $2,415
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $601 $1,000 - $601
-
MMBtu
TOTAL RECOMMENDED $15,234 $28,700 $2,577
30,993
kWh
$12,657
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs