ITAC Assessment: OK0571
ITAC logo
ITAC Assessment: OK0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Miniature, incandescent, neon & light emitting diode lamps
NAICS
n/a
SIC 3641: Electric Lamp Bulbs and Tubes
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 30,000
ft2
Annual Production 80,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,045 1,477,433
kWh
Electricity Demand $22,950 -
Natural Gas $15,584 3,139
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.2515: Use optimum thickness insulation $3,598 $649 - - $3,598
-
MMBtu
- -
02 2.4221: Install compressor air intakes in coolest locations $615 $130 $615
10,258
kWh
- - - -
03 2.7135: Install occupancy sensors $7,735 $1,689 $5,718
127,784
kWh
$2,017
-
kW-mo/yr
- - -
04 2.6232: Install set-back timers $372 $387 $372
21,981
kWh
- - - -
05 4.821: Pay bills on time to avoid late fees $782 - - - - - $782
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,160 $10,828 - - - $5,160
-
lb
-
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,160 - - - - $2,160
-
lb
-
TOTAL RECOMMENDED $20,422 $13,683 $6,705
160,023
kWh
$2,017
-
kW-mo/yr
$3,598
-
MMBtu
$7,320
-
lb
$782
TOTAL IMPLEMENTED $17,275 $13,166 $5,718
127,784
kWh
$2,017
-
kW-mo/yr
$3,598
-
MMBtu
$5,160
-
lb
$782
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs