ITAC Assessment: AR0094
ITAC logo
ITAC Assessment: AR0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Stone Washed and Wrinkle Free Garments
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 750,000
pieces
Production Hrs. Annual 2,086
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,627 571,512
kWh
Electricity Demand $15,958 4,221
kW-mo/yr
Natural Gas $72,113 15,673
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $602 $412 $483
5,569
kWh
$119
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,701 $1,445 $1,320
16,706
kWh
$381
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,020 $1,000 - - $2,020
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $521 $200 $370
4,689
kWh
$151
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $882 $1,520 $666
8,499
kWh
$216
-
kW-mo/yr
- -
06 2.2628: Utilize a less expensive cooling method $756 $756 $593
7,620
kWh
$163
-
kW-mo/yr
- -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $44,850 $8,000 - - - $44,850
-
lb
TOTAL RECOMMENDED $51,332 $13,333 $3,432
43,083
kWh
$1,030
-
kW-mo/yr
$2,020
-
MMBtu
$44,850
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs