ITAC Assessment: WM0032
ITAC logo
ITAC Assessment: WM0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Animal Milk Replacer
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 29
Plant Area 80,000
ft2
Annual Production 39,000
ton
Production Hrs. Annual 4,590
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,116 3,290,336
kWh
Electricity Demand $53,050 10,104
kW-mo/yr
Electricity Fees $41,048 -
Natural Gas $143,742 19,991
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,693 $1,260 $10,693
190,949
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,355 - $1,355
24,192
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,268 $11,516 $1,756
31,355
kWh
$512
-
kW-mo/yr
04 2.7135: Install occupancy sensors $276 $270 $276
4,919
kWh
-
05 2.6211: Conserve energy by efficient use of vending machines $91 $137 $91
1,628
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,500 $20,654 $9,500
169,570
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,700 $19,800 $10,700
191,075
kWh
-
TOTAL RECOMMENDED $34,883 $53,637 $34,371
613,688
kWh
$512
-
kW-mo/yr
TOTAL IMPLEMENTED $10,693 $1,260 $10,693
190,949
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs