Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0466 #13 Y:2012 Develop a repair/replace policy $477 $470
WV0466 #12 Y:2012 Eliminate or reduce compressed air usage $1,001 $113
WV0466 #11 Y:2012 Use waste heat from flue gases to heat space conditioning air $1,129 $5,550
WV0466 #10 Y:2012 Reduce the pressure of compressed air to the minimum required $1,248 $30
WV0466 #09 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,160 $488
WV0466 #08 Y:2012 Improve lubrication practices $2,167 $1,000
WV0466 #07 Y:2012 Burn waste oil for heat $2,530 $4,000
WV0466 #06 Y:2012 Optimize plant power factor $3,614 $5,600
WV0466 #05 Y:2012 Use waste heat from hot flue gases to preheat $12,752 $3,840
WV0466 #04 Y:2012 Establish a predictive maintenance program $11,321 $1,000
WV0466 #03 Y:2012 Utilize energy-efficient belts and other improved mechanisms $11,380 -
WV0466 #02 Y:2012 Insulate bare equipment $15,207 $35,976
WV0466 #01 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $73,182 $32,900
UK1216 #04 Y:2012 Repair and eliminate steam leaks $31,294 $26,400
UK1216 #03 Y:2012 Use most efficient type of electric motors $145,660 $993,792
UK1216 #02 Y:2012 Reduce illumination to minimum necessary levels $2,150 $1,000
UK1216 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $4,607 $4,607
WV0465 #10 Y:2012 Remove or close off unneeded compressed air lines $155 $90
WV0465 #09 Y:2012 Develop a repair/replace policy $174 $415
WV0465 #08 Y:2012 Insulate bare equipment $1,171 $816