ITAC Assessment: UK1216
ITAC logo
ITAC Assessment: UK1216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product wood drying
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 160,000
ft2
Annual Production 125
units
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,094 3,261,201
kWh
Electricity Demand $106,149 10,424
kW-mo/yr
Electricity Fees $20,595 -
Natural Gas $160,267 49,912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $183,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,607 $4,607 $2,262
50,832
kWh
$2,345
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $2,150 $1,000 $2,150
48,330
kWh
- -
03 2.4133: Use most efficient type of electric motors $145,660 $993,792 $60,560
1,360,900
kWh
$85,100
-
kW-mo/yr
-
04 2.2135: Repair and eliminate steam leaks $31,294 $26,400 - - $31,294
-
MMBtu
TOTAL RECOMMENDED $183,711 $1,025,799 $64,972
1,460,062
kWh
$87,445
-
kW-mo/yr
$31,294
-
MMBtu
TOTAL IMPLEMENTED $183,711 $1,025,799 $64,972
1,460,062
kWh
$87,445
-
kW-mo/yr
$31,294
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs