ITAC Assessment: WV0465
ITAC logo
ITAC Assessment: WV0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product plastic electrical outlet boxes
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 210,000
ft2
Annual Production 34,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,174 2,890,283
kWh
Electricity Demand $118,154 5,847
kW-mo/yr
Natural Gas $43,169 5,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,076

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,796 $52,900 $19,537
512,512
kWh
$17,259
-
kW-mo/yr
- - -
02 2.4226: Use / purchase optimum sized compressor $22,591 $44,160 $1,378
36,142
kWh
$1,213
-
kW-mo/yr
- - $20,000
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,229 $16,800 $4,904
128,636
kWh
$4,325
-
kW-mo/yr
- - -
04 2.2449: Recover heat from exhausted steam, hot air or hot water $5,400 $6,350 $540
14,163
kWh
$485
-
kW-mo/yr
$4,375
-
MMBtu
- -
05 2.4157: Establish a predictive maintenance program $4,786 $1,000 $3,223
84,547
kWh
$2,850
-
kW-mo/yr
- $(-1,287.0) -
06 2.4239: Eliminate or reduce compressed air usage $1,638 $1,083 $870
22,815
kWh
$768
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,174 $3,762 $507
13,292
kWh
$667
-
kW-mo/yr
- - -
08 2.2511: Insulate bare equipment $1,171 $816 $625
16,408
kWh
$546
-
kW-mo/yr
- - -
09 2.4151: Develop a repair/replace policy $174 $415 $153
4,026
kWh
$141
-
kW-mo/yr
- $(-120.0) -
10 2.4235: Remove or close off unneeded compressed air lines $155 $90 $155
4,068
kWh
- - - -
TOTAL RECOMMENDED $83,114 $127,376 $31,892
836,609
kWh
$28,254
-
kW-mo/yr
$4,375
-
MMBtu
$(-1,407.0) $20,000
TOTAL IMPLEMENTED $76,076 $119,943 $30,482
799,631
kWh
$27,001
-
kW-mo/yr
- $(-1,407.0) $20,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs