Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,765

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2501 #05 Y:2025 Replace existing equipment with more suitable substitutes $6,682 $32,756
UW2501 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $13,175 $10,269
UW2501 #03 Y:2025 Install occupancy sensors $8,699 $6,545
UW2501 #02 Y:2025 Repair or replace steam traps $83,082 $9,800
UW2501 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $52,448 $25,000
OR0800 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $1,775 $10,104
OR0800 #03 Y:2024 Use solar heat to make electricty $77,631 $300,000
OR0800 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,219 $9,036
OR0800 #01 Y:2024 Minimize operation of equipment maintained in standby condition $5,407 -
UW2414 #11 Y:2024 Use other methods for neutralization $13,133 $58,000
UW2414 #10 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,737 $25,000
UW2414 #09 Y:2024 Purchase new equipment to reduce material use / cost $252,286 $90,000
UW2414 #08 Y:2024 Install vinyl strip / high speed / air curtain doors $24,539 $52,000
UW2414 #07 Y:2024 Use solar heat to make electricty $37,019 $162,415
UW2414 #06 Y:2024 Adopt in-house material generation $36,181 $110,000
UW2414 #05 Y:2024 Level three - install or modify control system with communication and nonlocal external information (i.e. weather foreca $57,690 $7,906
UW2414 #04 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $92,758 $115,000
UW2414 #03 Y:2024 Insulate glazing, walls, ceilings, and roofs $812 $1,219
UW2414 #02 Y:2024 Reduce defects by reducing product tipping $16,683 $96,069
UW2414 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $141 $220