ITAC Assessment: UW2509
ITAC logo
ITAC Assessment: UW2509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aircraft Engine and Parts Manufacturing
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 119,866
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,648 1,732,569
kWh
Electricity Demand $4,653 2,984
kW-mo/yr
Electricity Fees $14,336 -
Natural Gas $131,434 8,280
MMBtu
TOTAL YEARLY COSTS $303,071
RECOMMENDED SAVINGS* $148,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $130,385 $1,125,377 $129,679
1,471,951
kWh
$706
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,759 $18,648 $2,590
29,393
kWh
$169
-
kW-mo/yr
03 2.7135: Install occupancy sensors $6,569 $12,849 $6,569
74,568
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,643 $25,000 $8,113
92,088
kWh
$530
-
kW-mo/yr
TOTAL RECOMMENDED $148,356 $1,181,874 $146,951
1,668,000
kWh
$1,405
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs