Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,385

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0605 #08 Y:2026 Install vinyl strip / high speed / air curtain doors $1,230 $4,746
SU0605 #07 Y:2026 Conserve energy by efficient use of vending machines $104 $187
SU0605 #06 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $801 $1,268
SU0605 #05 Y:2026 Install / repair insulation on steam lines $266 $408
SU0605 #04 Y:2026 Use or replace with energy efficient substitutes $404 $303
SU0605 #03 Y:2026 Reduce space conditioning during non-working hours $9,917 $200
SU0605 #02 Y:2026 Eliminate/reduce an operation $51 -
SU0605 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $5,844 -
SU0604 #09 Y:2026 Conserve energy by efficient use of vending machines $47 $341
SU0604 #08 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,371 $19,740
SU0604 #07 Y:2026 Replace fossil fuel equipment with electrical equipment $7,137 $24,539
SU0604 #06 Y:2026 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $587 $1,742
SU0604 #05 Y:2026 Insulate bare equipment $745 $2,083
SU0604 #04 Y:2026 Install set-back timers $2,143 $222
SU0604 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $75 -
SU0604 #02 Y:2026 Eliminate/reduce an operation $659 -
SU0604 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $13,321 -
SU0603 #11 Y:2026 Insulate bare equipment $24 $131
SU0603 #10 Y:2026 Conserve energy by efficient use of vending machines $175 $940
SU0603 #09 Y:2026 Use heat pump for space conditioning $13,288 $69,984