ITAC Assessment: SU0580
ITAC logo
ITAC Assessment: SU0580
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product sausage
NAICS 311613: Rendering and Meat Byproduct Processing
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 201
Plant Area 32,528
ft2
Annual Production 12,589,474
lb
Production Hrs. Annual 5,200
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,621 2,931,182
kWh
Electricity Demand $59,726 8,110
kW-mo/yr
Electricity Fees $9,682 -
Natural Gas $25,662 5,152
MMBtu
Other Gas $5,408 1
MMBtu
Waste Disposal Costs
Water Usage $39,778 9,390
Tgal
TOTAL YEARLY COSTS $186,878
RECOMMENDED SAVINGS* $6,625 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,986 - - $2,986
-
kW-mo/yr
- - -
02 2.7224: Reduce space conditioning during non-working hours $110 - - - $110
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,993 $246 $106
6,642
kWh
$148
-
kW-mo/yr
- $1,739 -
04 2.4322: Use or replace with energy efficient substitutes $404 $89 $184
11,475
kWh
$464
-
kW-mo/yr
$(-243.8)
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $172 $69 $172
10,724
kWh
- - - -
06 2.2511: Insulate bare equipment $281 $370 - - $281
-
MMBtu
- -
07 2.4322: Use or replace with energy efficient substitutes $243 $531 $39
2,453
kWh
$25
-
kW-mo/yr
- - $179
08 2.7135: Install occupancy sensors $436 $1,102 $436
27,228
kWh
- - - -
TOTAL RECOMMENDED $6,625 $2,408 $936
58,523
kWh
$3,623
-
kW-mo/yr
$148
-
MMBtu
$1,739 $179
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs