Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,749

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0455 #04 Y:2025 Reduce delivery schedules $170,400 $21,600
MS0455 #03 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $675 $2,667
MS0455 #02 Y:2025 Use solar heat to make electricty $17,043 $161,000
MS0455 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $15,878 $75,000
MS0454 #05 Y:2025 Re-size charging openings or add movable cover or door $12,383 -
MS0454 #04 Y:2025 Add equipment/ operators to reduce production bottleneck $2,292,500 $1,179,452
MS0454 #03 Y:2025 Replace treated water with well / surface water $18,747 $64,200
MS0454 #02 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $11,257 $1,712
MS0454 #01 Y:2025 Purchase equipment instead of leasing $85,200 $140,028
MS0453 #06 Y:2025 Change procedures / equipment / operating conditions $2,184,220 $60,000
MS0453 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,095 $1,190
MS0453 #04 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $7,830 $5,644
MS0453 #03 Y:2025 Automate finishing process $174,531 $413,494
MS0453 #02 Y:2025 Install back-up equipment $16,920 $3,906
MS0453 #01 Y:2025 Purchase equipment instead of leasing $138,378 $120,000
MS0452 #03 Y:2025 Condense operation into one building $26,400 $60,000
MS0452 #02 Y:2025 Use / purchase optimum sized compressor $2,035 $20,549
MS0452 #01 Y:2025 Change procedures / equipment / operating conditions $40,000 $43,390
MS0451 #05 Y:2025 Change rate schedules or other changes in utility service $1,553,856 -
MS0451 #04 Y:2025 Apply for tax-free status for energy purchases $119,576 -