2,652
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0325 #11 Y:2024 | 11 | 2024 | Use most efficient type of electric motors | $718 | $2,640 |
n/a
|
TT0325 #10 Y:2024 | 10 | 2024 | Meter waste water | $1,047 | $1,100 |
n/a
|
TT0325 #09 Y:2024 | 09 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $3,955 | $1,000 |
n/a
|
TT0325 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $4,068 | $15,000 |
n/a
|
TT0325 #07 Y:2024 | 07 | 2024 | Eliminate or reduce compressed air usage | $5,049 | $30,040 |
n/a
|
TT0325 #06 Y:2024 | 06 | 2024 | Turn off equipment when not in use | $5,854 | $400 |
n/a
|
TT0325 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $5,974 | $16,000 |
n/a
|
TT0325 #04 Y:2024 | 04 | 2024 | Use heat from boiler blowdown to preheat boiler feed water | $8,824 | $22,500 |
n/a
|
TT0325 #03 Y:2024 | 03 | 2024 | Preheat boiler makeup water with waste process heat | $30,978 | $17,480 |
n/a
|
TT0325 #02 Y:2024 | 02 | 2024 | Install smaller boiler (increase high fire duty cycle) | $68,822 | $200,000 |
n/a
|
TT0325 #01 Y:2024 | 01 | 2024 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $242,348 | $1,045,217 |
n/a
|
MS0437 #04 Y:2024 | 04 | 2024 | Replace fossil fuel equipment with electrical equipment | $288,884 | $300,000 |
n/a
|
MS0437 #03 Y:2024 | 03 | 2024 | Install occupancy sensors | $272 | $2,237 |
n/a
|
MS0437 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $34,017 | $458,990 |
n/a
|
MS0437 #01 Y:2024 | 01 | 2024 | Lower temperature during the winter season and vice-versa | $147 | - |
n/a
|
MS0436 #04 Y:2024 | 04 | 2024 | Optimize plant power factor | $822 | $15,226 |
n/a
|
MS0436 #03 Y:2024 | 03 | 2024 | Replace fossil fuel equipment with electrical equipment | $13,430 | $50,000 |
n/a
|
MS0436 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $52,267 | $553,175 |
n/a
|
MS0436 #01 Y:2024 | 01 | 2024 | Install timers on light switches in little used areas | $4,420 | $255 |
n/a
|
MS0435 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $609 | $2,713 |
n/a
|