Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,652

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0325 #11 Y:2024 Use most efficient type of electric motors $718 $2,640
TT0325 #10 Y:2024 Meter waste water $1,047 $1,100
TT0325 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,955 $1,000
TT0325 #08 Y:2024 Install occupancy sensors $4,068 $15,000
TT0325 #07 Y:2024 Eliminate or reduce compressed air usage $5,049 $30,040
TT0325 #06 Y:2024 Turn off equipment when not in use $5,854 $400
TT0325 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $5,974 $16,000
TT0325 #04 Y:2024 Use heat from boiler blowdown to preheat boiler feed water $8,824 $22,500
TT0325 #03 Y:2024 Preheat boiler makeup water with waste process heat $30,978 $17,480
TT0325 #02 Y:2024 Install smaller boiler (increase high fire duty cycle) $68,822 $200,000
TT0325 #01 Y:2024 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $242,348 $1,045,217
MS0437 #04 Y:2024 Replace fossil fuel equipment with electrical equipment $288,884 $300,000
MS0437 #03 Y:2024 Install occupancy sensors $272 $2,237
MS0437 #02 Y:2024 Use solar heat to make electricty $34,017 $458,990
MS0437 #01 Y:2024 Lower temperature during the winter season and vice-versa $147 -
MS0436 #04 Y:2024 Optimize plant power factor $822 $15,226
MS0436 #03 Y:2024 Replace fossil fuel equipment with electrical equipment $13,430 $50,000
MS0436 #02 Y:2024 Use solar heat to make electricty $52,267 $553,175
MS0436 #01 Y:2024 Install timers on light switches in little used areas $4,420 $255
MS0435 #05 Y:2024 Optimize plant power factor $609 $2,713