2,818
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MS0467 #04 Y:2026 | 04 | 2026 | Optimize plant power factor | $18,243 | $121,000 |
n/a
|
| MS0467 #03 Y:2026 | 03 | 2026 | Reduce the pressure of compressed air to the minimum required | $10,936 | - |
n/a
|
| MS0467 #02 Y:2026 | 02 | 2026 | Install vinyl strip / high speed / air curtain doors | $5,879 | $1,680 |
n/a
|
| MS0467 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,030 | $2,244 |
n/a
|
| MS0466 #06 Y:2026 | 06 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $19,101 | $93,000 |
n/a
|
| MS0466 #05 Y:2026 | 05 | 2026 | Replace hydraulic / pneumatic equipment with electric equipment | $42,861 | $712 |
n/a
|
| MS0466 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,210 | $2,244 |
n/a
|
| MS0466 #03 Y:2026 | 03 | 2026 | Combine utility meters | $300 | - |
n/a
|
| MS0466 #02 Y:2026 | 02 | 2026 | Change rate schedules or other changes in utility service | $44,517 | - |
n/a
|
| MS0466 #01 Y:2026 | 01 | 2026 | Optimize plant power factor | $41,807 | $88,391 |
n/a
|
| MS0465 #07 Y:2026 | 07 | 2026 | Apply for tax-free status for energy purchases | $7,003 | - |
n/a
|
| MS0465 #06 Y:2026 | 06 | 2026 | Clean or color roof to reduce solar load | $4,092 | $42,669 |
n/a
|
| MS0465 #05 Y:2026 | 05 | 2026 | Lower temperature during the winter season and vice-versa | $4,474 | - |
n/a
|
| MS0465 #04 Y:2026 | 04 | 2026 | Reschedule and rearrange multiple-source heating systems | $14,437 | - |
n/a
|
| MS0465 #03 Y:2026 | 03 | 2026 | Keep doors and windows shut when not on use | $39,664 | $104,260 |
n/a
|
| MS0465 #02 Y:2026 | 02 | 2026 | Purchase new equipment to reduce material use / cost | $398 | $1,280 |
n/a
|
| MS0465 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $408 | $2,243 |
n/a
|
| LS2604 #03 Y:2026 | 03 | 2026 | Utilize higher efficiency lamps and/or ballasts | $1,863 | $4,385 |
n/a
|
| LS2604 #02 Y:2026 | 02 | 2026 | Utilize daylight whenever possible in lieu of artificial light | $823 | $125 |
n/a
|
| LS2604 #01 Y:2026 | 01 | 2026 | Clean and maintain refrigerant condensers and towers | $3,713 | $1,000 |
n/a
|