Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,063

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1147 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,835 $21,094
OK1147 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,474 $13,679
OK1147 #06 Y:2025 Apply for tax-free status for energy purchases $17,308 -
OK1147 #05 Y:2025 Optimize plant power factor $15,914 $8,034
OK1147 #04 Y:2025 Eliminate or reduce compressed air usage $5,012 -
OK1147 #03 Y:2025 Recover waste heat from equipment $2,712 $1,080
OK1147 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $687 -
OK1147 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,489 $1,176
OK1146 #10 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $67,194 $36,360
OK1146 #09 Y:2025 Use solar heat to make electricty $12,341 $218,400
OK1146 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $20,326 $16,391
OK1146 #07 Y:2025 Clean and maintain refrigerant condensers and towers $878 $1,980
OK1146 #06 Y:2025 Repair faulty insulation in furnaces, boilers, etc $7,470 $1,913
OK1146 #05 Y:2025 Eliminate or reduce compressed air usage $723 $621
OK1146 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $18,445 $2,615
OK1146 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $1,188 -
OK1146 #02 Y:2025 Recover waste heat from equipment $8,442 $1,920
OK1146 #01 Y:2025 Optimize plant power factor $13,156 $11,709
OK1142 #06 Y:2025 Reduce space conditioning during non-working hours $401 -
OK1142 #05 Y:2025 Install occupancy sensors $6,818 $1,869