Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,946

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0467 #08 Y:2025 Use solar heat to make electricty $146,758 $671,919
MI0467 #07 Y:2025 Replace existing hvac unit with high efficiency model $26,731 $46,265
MI0467 #06 Y:2025 Use photocell controls $742 $720
MI0467 #05 Y:2025 Turn off equipment when not in use $4,820 $2,600
MI0467 #04 Y:2025 Recharge batteries on during off-peak demand periods $9,626 $320
MI0467 #03 Y:2025 Air condition only space necessary $47,824 $1,440
MI0467 #02 Y:2025 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $31,123 $711
MI0467 #01 Y:2025 Lower temperature during the winter season and vice-versa $16,554 -
MI0465 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,975 $22,686
MI0465 #06 Y:2025 Air condition only space necessary $4,597 $5,600
MI0465 #05 Y:2025 Upgrade controls on compressors $42,932 $22,088
MI0465 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $31,692 $1,185
MI0465 #03 Y:2025 Lower temperature during the winter season and vice-versa $11,875 $210
MI0465 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $14,250 -
MI0465 #01 Y:2025 Turn off equipment during breaks, reduce operating time $3,097 -
MI0464 #06 Y:2025 Turn off equipment when not in use $1,948 $2,600
MI0464 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,193 $1,665
MI0464 #04 Y:2025 Air condition only space necessary $5,341 $960
MI0464 #03 Y:2025 Close holes and openings in building such as broken windows $5,173 $485
MI0464 #02 Y:2025 Utilize controls to operate equipment only when needed $3,243 -