ITAC Assessment: MI0462
ITAC logo
ITAC Assessment: MI0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Primary Metal Products
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range greater than $500
M
# of Employees 50
Plant Area 31,960
ft2
Annual Production 5,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,150 2,707,960
kWh
Electricity Demand $26,894 5,394
kW-mo/yr
Electricity Fees $18,991 -
TOTAL YEARLY COSTS $165,035
RECOMMENDED SAVINGS* $45,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $15,504 $2,400 $15,504
352,367
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $4,582 $1,260 $3,505
79,666
kWh
$1,077
-
kW-mo/yr
03 2.7496: Install partitions to reduce size of conditioned space $5,309 $1,594 $4,596
104,458
kWh
$713
-
kW-mo/yr
04 2.7425: Clean or color roof to reduce solar load $4,679 $18,537 $3,572
81,182
kWh
$1,107
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $15,563 $77,756 $8,204
186,448
kWh
$7,359
-
kW-mo/yr
TOTAL RECOMMENDED $45,637 $101,547 $35,381
804,121
kWh
$10,256
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs