ITAC Assessment: UF0635
ITAC logo
ITAC Assessment: UF0635
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Custom Metal Parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 15,000
ft2
Annual Production 44,262
pieces
Production Hrs. Annual 2,730
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,580 188,760
kWh
Electricity Demand $12,934 994
kW-mo/yr
Electricity Fees $4,865 -
Fuel Oil #4 $51,951 64
MMBtu
Other Gas $18,087 1,257
MMBtu
Other Energy $16,606 1,041
MMBtu
TOTAL YEARLY COSTS $116,023
RECOMMENDED SAVINGS* $363,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $45,327 $12,413 $(-557.0)
(-9,128)
kWh
$(-548.0)
-
kW-mo/yr
- - $46,432
02 2.9114: Use solar heat to make electricty $24,006 $322,608 $11,514
188,760
kWh
$12,492
-
kW-mo/yr
- - -
03 2.4322: Use or replace with energy efficient substitutes $15,192 $55,000 $(-1,320.0)
(-21,638)
kWh
$(-94.0)
-
kW-mo/yr
- $16,606
-
MMBtu
-
04 2.3191: Use demand controller or load shedder $1,712 $1,016 $806
13,212
kWh
$906
-
kW-mo/yr
- - -
05 4.114: Add/modify equipment to improve drying process $165,176 $50,246 - - $(-14,970.0)
-
MMBtu
- $180,146
06 4.441: Install automatic packing equipment $89,807 $7,500 $(-56.0)
(-913)
kWh
$(-137.0)
-
kW-mo/yr
- - $90,000
07 4.424: Improve space comfort conditioning $22,083 $2,620 $(-585.0)
(-9,582)
kWh
$(-548.0)
-
kW-mo/yr
- - $23,216
TOTAL RECOMMENDED $363,303 $451,403 $9,802
160,711
kWh
$12,071
-
kW-mo/yr
$(-14,970.0)
-
MMBtu
$16,606
-
MMBtu
$339,794
TOTAL IMPLEMENTED - - - - - - -