Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,079

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0248 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $771 $736
DL0248 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $7,995 $4,980
DL0248 #05 Y:2024 Use optimum temperature $1,534 $550
DL0248 #04 Y:2024 Use / purchase optimum sized compressor $4,139 $10,680
DL0248 #03 Y:2024 Insulate bare equipment $5,964 $373
DL0248 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $5,209 $291
DL0248 #01 Y:2024 Utilize controls to operate equipment only when needed $2,580 -
DL0247 #09 Y:2024 Utilize a less expensive cooling method $116,551 $1,000,000
DL0247 #08 Y:2024 Replace existing chiller with high efficiency model $27,958 $200,000
DL0247 #07 Y:2024 Meter waste water $34,580 $145
DL0247 #06 Y:2024 Turn off equipment when not in use $993 -
DL0247 #05 Y:2024 Turn off equipment when not in use $399 -
DL0247 #04 Y:2024 Turn off steam / hot water lines leading to space heating units $1,592 -
DL0247 #03 Y:2024 Lower temperature during the winter season and vice-versa $1,671 -
DL0247 #02 Y:2024 Utilize controls to operate equipment only when needed $4,382 -
DL0247 #01 Y:2024 Reduce space conditioning during non-working hours $350 -
DL0246 #06 Y:2024 Turn off equipment during breaks, reduce operating time $12,745 $18,000
DL0246 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $13,359 $16,560
DL0246 #04 Y:2024 Recycle air for heating, ventilation and air conditioning $65,735 $420,000
DL0246 #03 Y:2024 Recover waste heat from equipment $8,062 $21,900