ITAC Assessment: DL0258
ITAC logo
ITAC Assessment: DL0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Injection Molded Plastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 40,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 6,206
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,674 1,634,667
kWh
Electricity Demand $29,523 4,004
kW-mo/yr
Electricity Fees $2,934 -
Natural Gas $11,135 1,047
MMBtu
Other Gas $980 1
MMBtu
TOTAL YEARLY COSTS $193,246
RECOMMENDED SAVINGS* $22,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $2,112 $5,500 $2,112
23,211
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,808 $25,000 $12,808
140,745
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,102 $3,500 $4,589
50,436
kWh
$513
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,565 $200 $2,565
28,190
kWh
-
TOTAL RECOMMENDED $22,587 $34,200 $22,074
242,582
kWh
$513
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs