Assessment Year | 2006 |
---|---|
Principal Product | Turbine Engine Blades |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
150,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 6,312
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $975,676 | 43,561 |
kWh
|
$22.40 |
Electricity Demand | $166,897 | 36,064 |
kW-mo/yr
|
$4.63 |
Natural Gas | $166,316 | 43,354 |
MMBtu
|
$3.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,435 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,030 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $18,180 | $16 |
$18,180
293,270
kWh
|
- | |
02 | 2.4226: Use / purchase optimum sized compressor | $9,225 | $60 |
$9,225
148,880
kWh
|
- | |
03 | 2.4131: Size electric motors for peak operating efficiency | $4,180 | $630 |
$3,700
59,830
kWh
|
$480
-
kW-mo/yr
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,450 | $120 |
$2,240
36,072
kWh
|
$210
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,400 | - |
$13,700
221,197
kWh
|
$1,700
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $49,435 | $826 |
$47,045
759,249
kWh
|
$2,390
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $36,030 | $136 |
$34,120
550,539
kWh
|
$1,910
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs