ITAC Assessment: DL0260
ITAC logo
ITAC Assessment: DL0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Medical Laundry
NAICS 812332: Industrial Launderers
SIC 7211: Power Laundries, Family and Commercial
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 60,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,692 2,419,099
kWh
Electricity Demand $129,069 6,703
kW-mo/yr
Electricity Fees $15,575 -
Natural Gas $344,709 52,761
MMBtu
Other Gas $25,418 1
MMBtu
Waste Disposal Costs
Water Usage $208,871 18,405
Tgal
Water Disposal $52,275 10,384
Tgal
Other Liquid (non-haz) $10,638 1
gal
TOTAL YEARLY COSTS $969,247
RECOMMENDED SAVINGS* $141,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $30,961 $16,000 - - $30,961
-
MMBtu
02 2.2121: Increase amount of condensate returned $4,398 - - - $4,398
-
MMBtu
03 2.2437: Recover waste heat from equipment $58,770 $200,000 - - $58,770
-
MMBtu
04 2.1113: Reduce combustion air flow to optimum $1,763 $5,000 - - $1,763
-
MMBtu
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $4,400 $20,000 - - $4,400
-
MMBtu
06 2.4226: Use / purchase optimum sized compressor $15,800 $60,000 $15,800
192,700
kWh
- -
07 2.4235: Remove or close off unneeded compressed air lines $1,580 - $1,580
19,300
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,619 $9,000 $12,917
157,500
kWh
$6,702
-
kW-mo/yr
-
09 2.4239: Eliminate or reduce compressed air usage $4,105 - $4,105
50,061
kWh
- -
TOTAL RECOMMENDED $141,396 $310,000 $34,402
419,561
kWh
$6,702
-
kW-mo/yr
$100,292
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs