ITAC Assessment: OK0830
ITAC logo
ITAC Assessment: OK0830
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Steel tanks and containers
NAICS 332439: Other Metal Container Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 105,000
ft2
Annual Production 11,648
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,572 1,349,100
kWh
Electricity Demand $33,014 5,199
kW-mo/yr
Natural Gas $11,096 2,191
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,255 $1,300 $2,255
37,580
kWh
- -
02 2.2437: Recover waste heat from equipment $1,339 $1,378 - - $1,339
-
MMBtu
03 2.4322: Use or replace with energy efficient substitutes $565 $1,540 $565
9,413
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $340 $470 $198
3,306
kWh
$142
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $152 $1,744 $152
2,541
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,068 $8,256 $717
11,955
kWh
$351
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,847 $19,241 $6,847
114,113
kWh
- -
08 2.7241: Install outside air damper / economizer on hvac unit $2,673 $4,950 $2,673
44,544
kWh
- -
09 2.6232: Install set-back timers $1,626 $2,310 - - $1,626
-
MMBtu
10 2.6232: Install set-back timers $1,870 $378 $635
10,587
kWh
- $1,235
-
MMBtu
11 2.7211: Clean and maintain refrigerant condensers and towers $1,434 $1,170 $1,060
17,668
kWh
$374
-
kW-mo/yr
-
TOTAL RECOMMENDED $20,169 $42,737 $15,102
251,707
kWh
$867
-
kW-mo/yr
$4,200
-
MMBtu
TOTAL IMPLEMENTED $7,532 $13,114 $5,430
90,509
kWh
$867
-
kW-mo/yr
$1,235
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs