Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,301

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0672 #10 Y:2025 Recover waste heat from equipment $43,311 $4,700
SD0672 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $16,737 $8,530
SD0672 #08 Y:2025 Recover waste heat from equipment $21,315 $2,000
SD0672 #07 Y:2025 Reschedule plant operations or reduce load to avoid peaks $30,634 -
SD0672 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,804 $3,518
SD0672 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $16,016 $8,765
SD0672 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $5,349 -
SD0672 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $565 $847
SD0672 #02 Y:2025 Use battery storage for demand control $18,727 $2,631
SD0672 #01 Y:2025 Use solar heat to make electricty $24,489 $112,796
SD0671 #06 Y:2025 Reduce space conditioning during non-working hours $1,404 -
SD0671 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,033 $9,226
SD0671 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $14,911 $23,188
SD0671 #03 Y:2025 Recharge batteries on during off-peak demand periods $3,996 -
SD0671 #02 Y:2025 Use battery storage for demand control $2,541 $1,352
SD0671 #01 Y:2025 Use solar heat to make electricty $72,797 $103,994
SJ0034 #04 Y:2025 Use power during off-peak periods $1,270 -
SJ0034 #03 Y:2025 Use optimum temperature $3,458 -
SJ0034 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,631 $10,962
SJ0034 #01 Y:2025 Use solar heat to make electricty $31,541 $106,228