ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SJ0036 #06 Y:2025 | 06 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $39,541 | - |
n/a
|
SJ0036 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $5,243 | - |
n/a
|
SJ0036 #04 Y:2025 | 04 | 2025 | Replace existing equipment with more suitable substitutes | $13,688 | $62,974 |
n/a
|
SJ0036 #03 Y:2025 | 03 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $4,847 | $12,868 |
n/a
|
SJ0036 #02 Y:2025 | 02 | 2025 | Use battery storage for demand control | $7,434 | $51,497 |
n/a
|
SJ0036 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $74,641 | $376,992 |
n/a
|
CI0050 #08 Y:2025 | 08 | 2025 | Turn off equipment during breaks, reduce operating time | $1,212 | $150 |
n/a
|
CI0050 #07 Y:2025 | 07 | 2025 | Use photocell controls | $1,562 | $1,012 |
n/a
|
CI0050 #06 Y:2025 | 06 | 2025 | Recharge batteries on during off-peak demand periods | $2,037 | $120 |
n/a
|
CI0050 #05 Y:2025 | 05 | 2025 | Use power during off-peak periods | $7,726 | $11,000 |
n/a
|
CI0050 #04 Y:2025 | 04 | 2025 | Eliminate or reduce compressed air usage | $8,212 | $3,000 |
n/a
|
CI0050 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $41,763 | $5,000 |
n/a
|
CI0050 #02 Y:2025 | 02 | 2025 | Use or replace with energy efficient substitutes | $45,303 | $310,000 |
n/a
|
CI0050 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $87,810 | $829,924 |
n/a
|
CI0049 #11 Y:2025 | 11 | 2025 | Use most efficient type of electric motors | $918 | $470 |
n/a
|
CI0049 #10 Y:2025 | 10 | 2025 | Preheat combustion air with waste heat | $5,572 | $11,000 |
n/a
|
CI0049 #09 Y:2025 | 09 | 2025 | Replace fossil fuel equipment with electrical equipment | $9,652 | $40,000 |
n/a
|
CI0049 #08 Y:2025 | 08 | 2025 | Use power during off-peak periods | $13,567 | $22,000 |
n/a
|
CI0049 #07 Y:2025 | 07 | 2025 | Adopt in-house material generation | $13,673 | $175,000 |
n/a
|
CI0049 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,474 | $5,000 |
n/a
|