Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13,174

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0699 #10 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,660 $8,300
SD0699 #09 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $22,763 $14,600
SD0699 #08 Y:2026 Use battery storage for demand control $104,154 $149,450
SD0699 #07 Y:2026 Use solar heat to make electricty $127,345 $250,841
SD0699 #06 Y:2026 Use most efficient type of electric motors $32,026 $19,665
SD0699 #05 Y:2026 Eliminate or reduce compressed air usage $2,884 $5,195
SD0699 #04 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $1,371 $2,200
SD0699 #03 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $1,371 $2,200
SD0699 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $2,714 -
SD0699 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $202 $847
CI0092 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $585 -
CI0092 #08 Y:2026 Turn off equipment during breaks, reduce operating time $1,364 $2,000
CI0092 #07 Y:2026 Use photocell controls $1,530 $930
CI0092 #06 Y:2026 Upgrade obsolete equipment $1,647 $25,000
CI0092 #05 Y:2026 Reschedule plant operations or reduce load to avoid peaks $2,629 $1,000
CI0092 #04 Y:2026 Adjust / maintain fork lift trucks for most efficient operation $3,149 $19,000
CI0092 #03 Y:2026 Use solar heat to make electricty $12,136 $56,000
CI0092 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $15,811 $4,500
CI0092 #01 Y:2026 Replace old machine with new automatic multi-station tool $27,870 $90,000
SD0698 #11 Y:2026 Use battery storage for demand control $21,343 $76,800