Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,255

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0045 #08 Y:2025 Use most efficient type of electric motors $1,247 $910
CI0045 #07 Y:2025 Recover waste heat from equipment $3,694 $5,000
CI0045 #06 Y:2025 Use or replace with energy efficient substitutes $4,072 $25,000
CI0045 #05 Y:2025 Insulate bare equipment $13,658 $2,310
CI0045 #04 Y:2025 Use photocell controls $36,786 $6,000
CI0045 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $75,467 $293,581
CI0045 #02 Y:2025 Use battery storage for demand control $118,038 $200,000
CI0045 #01 Y:2025 Use solar heat to make electricty $360,332 $3,128,595
SD0669 #08 Y:2025 Use properly designed and sized hvac equipment $21,106 $91,450
SD0669 #07 Y:2025 Install direct acting units in place of compressed air pressure system in safety system $19,984 $1,400
SD0669 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,220 $1,016
SD0669 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $14,398 $3,518
SD0669 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,099 $2,437
SD0669 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $1,779 -
SD0669 #02 Y:2025 Use battery storage for demand control $20,905 $894
SD0669 #01 Y:2025 Use solar heat to make electricty $298,549 $273,844
SD0668 #09 Y:2024 Optimize plant power factor $134,656 -
SD0668 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,230 $3,246
SD0668 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $300 $1,214
SD0668 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $922 $1,623