2,381
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TN0247 #02 Y:1985 | 02 | 1985 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,753 | $135 | |
| TN0247 #01 Y:1985 | 01 | 1985 | Redesign process | $8,108 | $2,000 | |
| ST0025 #11 Y:1985 | 11 | 1985 | Use proper thickness of insulation on building envelope | $32,119 | $10,000 | |
| ST0025 #10 Y:1985 | 10 | 1985 | Install storm windows and doors | $14,477 | $8,500 | |
| ST0025 #09 Y:1985 | 09 | 1985 | Reduce space conditioning during non-working hours | $25,374 | - | |
| ST0025 #08 Y:1985 | 08 | 1985 | Reschedule plant operations or reduce load to avoid peaks | $2,777 | $1,900 | |
| ST0025 #07 Y:1985 | 07 | 1985 | Use waste heat from hot flue gases to preheat | $281 | $2,200 | |
| ST0025 #06 Y:1985 | 06 | 1985 | Recover and reuse cooling water | $700 | $1,000 | |
| ST0025 #05 Y:1985 | 05 | 1985 | Establish equipment maintenance schedule | $1,596 | - | |
| ST0025 #04 Y:1985 | 04 | 1985 | Analyze flue gas for proper air/fuel ratio | $1,350 | $537 | |
| ST0025 #03 Y:1985 | 03 | 1985 | Utilize higher efficiency lamps and/or ballasts | $14,372 | $1,025 | |
| ST0025 #02 Y:1985 | 02 | 1985 | Use minimum safe oven ventilation | $3,945 | $250 | |
| ST0025 #01 Y:1985 | 01 | 1985 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,196 | $216 | |
| ST0024 #13 Y:1985 | 13 | 1985 | Install vinyl strip / high speed / air curtain doors | $2,126 | $76 | |
| ST0024 #12 Y:1985 | 12 | 1985 | Reduce space conditioning during non-working hours | $8,820 | - | |
| ST0024 #11 Y:1985 | 11 | 1985 | Utilize higher efficiency lamps and/or ballasts | $7,038 | $2,186 | |
| ST0024 #10 Y:1985 | 10 | 1985 | Reschedule plant operations or reduce load to avoid peaks | $7,186 | $1,900 | |
| ST0024 #09 Y:1985 | 09 | 1985 | Insulate bare equipment | $44 | $26 | |
| ST0024 #08 Y:1985 | 08 | 1985 | Replace electrically-operated equipment with fossil fuel equipment | $1,190 | $1,428 | |
| ST0024 #07 Y:1985 | 07 | 1985 | Reduce hot water temperature to the minimum required | $1,678 | - |