Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,381

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0247 #02 Y:1985 Eliminate leaks in inert gas and compressed air lines/ valves $1,753 $135
TN0247 #01 Y:1985 Redesign process $8,108 $2,000
ST0025 #11 Y:1985 Use proper thickness of insulation on building envelope $32,119 $10,000
ST0025 #10 Y:1985 Install storm windows and doors $14,477 $8,500
ST0025 #09 Y:1985 Reduce space conditioning during non-working hours $25,374 -
ST0025 #08 Y:1985 Reschedule plant operations or reduce load to avoid peaks $2,777 $1,900
ST0025 #07 Y:1985 Use waste heat from hot flue gases to preheat $281 $2,200
ST0025 #06 Y:1985 Recover and reuse cooling water $700 $1,000
ST0025 #05 Y:1985 Establish equipment maintenance schedule $1,596 -
ST0025 #04 Y:1985 Analyze flue gas for proper air/fuel ratio $1,350 $537
ST0025 #03 Y:1985 Utilize higher efficiency lamps and/or ballasts $14,372 $1,025
ST0025 #02 Y:1985 Use minimum safe oven ventilation $3,945 $250
ST0025 #01 Y:1985 Eliminate leaks in inert gas and compressed air lines/ valves $7,196 $216
ST0024 #13 Y:1985 Install vinyl strip / high speed / air curtain doors $2,126 $76
ST0024 #12 Y:1985 Reduce space conditioning during non-working hours $8,820 -
ST0024 #11 Y:1985 Utilize higher efficiency lamps and/or ballasts $7,038 $2,186
ST0024 #10 Y:1985 Reschedule plant operations or reduce load to avoid peaks $7,186 $1,900
ST0024 #09 Y:1985 Insulate bare equipment $44 $26
ST0024 #08 Y:1985 Replace electrically-operated equipment with fossil fuel equipment $1,190 $1,428
ST0024 #07 Y:1985 Reduce hot water temperature to the minimum required $1,678 -