ITAC Assessment: ST0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product EXPENDABLE PROBES
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 3,904
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,878 2,701,055
kWh
Natural Gas $51,034 7,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $196 - $196
2,638
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $65 $95 $65
879
kWh
-
03 2.2437: Recover waste heat from equipment $1,844 $1,600 - $1,844
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $893 $112 $893
12,016
kWh
-
05 2.7242: Change zone reheat coils to variable air volume boxes $2,549 $3,000 $1,765
23,740
kWh
$784
-
MMBtu
06 2.1123: Install automatic stack damper $200 $2,550 - $200
-
MMBtu
07 2.6121: Reduce hot water temperature to the minimum required $1,678 - $1,678
22,567
kWh
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,190 $1,428 $1,961
26,377
kWh
$(-771.0)
-
MMBtu
09 2.2511: Insulate bare equipment $44 $26 $44
586
kWh
-
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,186 $1,900 $7,186
-
kWh
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $7,038 $2,186 $7,038
94,666
kWh
-
12 2.7224: Reduce space conditioning during non-working hours $8,820 - - $8,820
-
MMBtu
13 2.7447: Install vinyl strip / high speed / air curtain doors $2,126 $76 - $2,126
-
MMBtu
TOTAL RECOMMENDED $33,829 $12,973 $20,826
183,469
kWh
$13,003
-
MMBtu
TOTAL IMPLEMENTED $19,161 $4,300 $17,035
132,473
kWh
$2,126
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs