Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,079

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0180 #06 Y:1997 Install occupancy sensors $699 $931
IA0180 #05 Y:1997 Utilize higher efficiency lamps and/or ballasts $443 $400
IA0180 #04 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,123 $4,378
IA0180 #03 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $6,423 $992
IA0180 #02 Y:1997 Convert to high volume low pressure (hvlp) paint guns $10,858 $2,000
IA0180 #01 Y:1997 Lease / purchase baler; sell cardboard to recycler $45,671 $8,400
UD0533 #09 Y:1997 Minimize water usage $125 $60
UD0533 #08 Y:1997 Turn off equipment during breaks, reduce operating time $101 $50
UD0533 #07 Y:1997 Replace existing equipment with more suitable substitutes $37,000 $36,000
UD0533 #06 Y:1997 Replace electrically-operated equipment with fossil fuel equipment $1,574 $20,000
UD0533 #05 Y:1997 Upgrade controls on compressors $553 $750
UD0533 #04 Y:1997 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $352 $50
UD0533 #03 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,455 $2,564
UD0533 #02 Y:1997 Use demand controller or load shedder $2,468 $200
UD0533 #01 Y:1997 Turn off equipment during breaks, reduce operating time $508 -
UD0532 #08 Y:1997 Re-arrange equipment layout to reduce handling costs $2,508 $4,880
UD0532 #07 Y:1997 Use heat in flue gases to preheat products or materials $10,100 $20,000
UD0532 #06 Y:1997 Repair furnaces and oven doors so that they seal efficiently $6,335 $5,000
UD0532 #05 Y:1997 Use other waste concentration methods $580 -
UD0532 #04 Y:1997 Utilize higher efficiency lamps and/or ballasts $123 $2,000