6,079
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IA0180 #06 Y:1997 | 06 | 1997 | Install occupancy sensors | $699 | $931 | |
| IA0180 #05 Y:1997 | 05 | 1997 | Utilize higher efficiency lamps and/or ballasts | $443 | $400 | |
| IA0180 #04 Y:1997 | 04 | 1997 | Utilize higher efficiency lamps and/or ballasts | $1,123 | $4,378 | |
| IA0180 #03 Y:1997 | 03 | 1997 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,423 | $992 | |
| IA0180 #02 Y:1997 | 02 | 1997 | Convert to high volume low pressure (hvlp) paint guns | $10,858 | $2,000 | |
| IA0180 #01 Y:1997 | 01 | 1997 | Lease / purchase baler; sell cardboard to recycler | $45,671 | $8,400 | |
| UD0533 #09 Y:1997 | 09 | 1997 | Minimize water usage | $125 | $60 | |
| UD0533 #08 Y:1997 | 08 | 1997 | Turn off equipment during breaks, reduce operating time | $101 | $50 | |
| UD0533 #07 Y:1997 | 07 | 1997 | Replace existing equipment with more suitable substitutes | $37,000 | $36,000 | |
| UD0533 #06 Y:1997 | 06 | 1997 | Replace electrically-operated equipment with fossil fuel equipment | $1,574 | $20,000 | |
| UD0533 #05 Y:1997 | 05 | 1997 | Upgrade controls on compressors | $553 | $750 | |
| UD0533 #04 Y:1997 | 04 | 1997 | Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $352 | $50 | |
| UD0533 #03 Y:1997 | 03 | 1997 | Utilize higher efficiency lamps and/or ballasts | $1,455 | $2,564 | |
| UD0533 #02 Y:1997 | 02 | 1997 | Use demand controller or load shedder | $2,468 | $200 | |
| UD0533 #01 Y:1997 | 01 | 1997 | Turn off equipment during breaks, reduce operating time | $508 | - | |
| UD0532 #08 Y:1997 | 08 | 1997 | Re-arrange equipment layout to reduce handling costs | $2,508 | $4,880 | |
| UD0532 #07 Y:1997 | 07 | 1997 | Use heat in flue gases to preheat products or materials | $10,100 | $20,000 | |
| UD0532 #06 Y:1997 | 06 | 1997 | Repair furnaces and oven doors so that they seal efficiently | $6,335 | $5,000 | |
| UD0532 #05 Y:1997 | 05 | 1997 | Use other waste concentration methods | $580 | - | |
| UD0532 #04 Y:1997 | 04 | 1997 | Utilize higher efficiency lamps and/or ballasts | $123 | $2,000 |