ITAC Assessment: UD0532
ITAC logo
ITAC Assessment: UD0532
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product sheet metal work, stampings
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 69,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,964 2,027,257
kWh
Electricity Demand $52,987 380
kW-mo/yr
Natural Gas $110,415 20,646
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,098

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4226: Use / purchase optimum sized compressor $5,469 - $2,820
133,060
kWh
$2,649
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,083 $15,018 $1,921
90,563
kWh
$3,162
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,422 $637 $711
33,411
kWh
$711
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $123 $2,000 $62
2,052
kWh
$61
-
kW-mo/yr
- - - -
05 3.3133: Use other waste concentration methods $580 - - - - $486
-
gal
- $94
06 2.1135: Repair furnaces and oven doors so that they seal efficiently $6,335 $5,000 - - $6,335
-
MMBtu
- - -
07 2.2424: Use heat in flue gases to preheat products or materials $10,100 $20,000 - - $10,100
-
MMBtu
- - -
08 4.514: Re-arrange equipment layout to reduce handling costs $2,508 $4,880 - - - - $2,508 -
TOTAL RECOMMENDED $31,620 $47,535 $5,514
259,086
kWh
$6,583
-
kW-mo/yr
$16,435
-
MMBtu
$486
-
gal
$2,508 $94
TOTAL IMPLEMENTED $20,098 $26,898 $4,803
225,675
kWh
$5,872
-
kW-mo/yr
$6,335
-
MMBtu
$486
-
gal
$2,508 $94
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs