Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,223

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
RU0057 #07 Y:1989 Turn off equipment during breaks, reduce operating time $2,372 -
RU0057 #06 Y:1989 Lower light fixtures in high ceiling areas $807 -
RU0057 #05 Y:1989 Improve lubrication practices $379 $800
RU0057 #04 Y:1989 Utilize energy-efficient belts and other improved mechanisms $387 $2,250
RU0057 #03 Y:1989 Install compressor air intakes in coolest locations $1,520 $594
RU0057 #02 Y:1989 Eliminate leaks in inert gas and compressed air lines/ valves $9,269 -
RU0057 #01 Y:1989 Utilize higher efficiency lamps and/or ballasts $1,747 $1,539
OR0053 #06 Y:1989 Optimize plant power factor $6,477 $13,650
OR0053 #05 Y:1989 Use most efficient type of electric motors $65 $80
OR0053 #04 Y:1989 Utilize higher efficiency lamps and/or ballasts $2,237 $2,200
OR0053 #03 Y:1989 Eliminate leaks in inert gas and compressed air lines/ valves $7,482 $3,000
OR0053 #02 Y:1989 Install set-back timers $499 $180
OR0053 #01 Y:1989 Install set-back timers $975 $300
OK0283 #09 Y:1989 Use hot process fluids to preheat incoming process fluids $1,730 $390
OK0283 #08 Y:1989 Use plant owned transformers or lease transformers $27,517 $67,000
OK0283 #07 Y:1989 Optimize plant power factor $2,541 $3,000
OK0283 #06 Y:1989 Install timers and/or thermostats $264 $84
OK0283 #05 Y:1989 Utilize higher efficiency lamps and/or ballasts $1,030 $255
OK0283 #04 Y:1989 Reduce illumination to minimum necessary levels $3,508 $475
OK0283 #03 Y:1989 Use most efficient type of electric motors $1,433 $1,256