ITAC Assessment: RU0057
ITAC logo
ITAC Assessment: RU0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STEEL OFFICE FURNITURE
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area
n/a
Annual Production 75,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,098 717,761
kWh
Natural Gas $40,380 8,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,747 $1,539 $1,747
18,464
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,269 - $9,269
97,597
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,520 $594 $1,520
16,120
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $387 $2,250 $387
4,103
kWh
-
05 2.4312: Improve lubrication practices $379 $800 $379
4,103
kWh
-
06 2.7141: Lower light fixtures in high ceiling areas $807 - $807
8,499
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $2,372 - $662
7,034
kWh
$1,710
-
MMBtu
TOTAL RECOMMENDED $16,481 $5,183 $14,771
155,920
kWh
$1,710
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs