ITAC Assessment: OK0283
ITAC logo
ITAC Assessment: OK0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ALIMINUM BEVERAGE CANS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area
n/a
Annual Production 27,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,113 11,626,905
kWh
Natural Gas $154,634 46,472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $24,830 $4,924 - $24,830
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,286 - $8,586
238,570
kWh
- $(-300.0)
03 2.4133: Use most efficient type of electric motors $1,433 $1,256 $1,433
33,411
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $3,508 $475 $3,200
73,564
kWh
- $308
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,030 $255 $1,030
22,860
kWh
- -
06 2.7261: Install timers and/or thermostats $264 $84 - $264
-
MMBtu
-
07 2.3212: Optimize plant power factor $2,541 $3,000 $2,541
-
kWh
- -
08 2.3511: Use plant owned transformers or lease transformers $27,517 $67,000 $27,517
-
kWh
- -
09 2.2444: Use hot process fluids to preheat incoming process fluids $1,730 $390 - $1,730
-
MMBtu
-
TOTAL RECOMMENDED $71,139 $77,384 $44,307
368,405
kWh
$26,824
-
MMBtu
$8
TOTAL IMPLEMENTED $39,850 $9,825 $13,590
294,841
kWh
$26,560
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs