ITAC Assessment: KU0472
ITAC logo
ITAC Assessment: KU0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product railway equipment
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 92,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 4,316
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,498 2,078,546
kWh
Electricity Demand $33,193 6,096
kW-mo/yr
Natural Gas $24,654 5,055
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.7444: Close holes and openings in building such as broken windows $920 $100 - - $920
-
MMBtu
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $610 $1,730 $340
14,361
kWh
$270
-
kW-mo/yr
- - - - -
03 2.7135: Install occupancy sensors $540 $1,500 $540
23,154
kWh
- - - - - -
04 2.4221: Install compressor air intakes in coolest locations $410 $310 $220
9,086
kWh
$190
-
kW-mo/yr
- - - - -
05 2.4314: Use synthetic lubricant $320 $310 $150
6,155
kWh
$90
-
kW-mo/yr
- - - $80 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $260 $480 $60
2,638
kWh
$20
-
kW-mo/yr
- - $180 - -
07 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $4,740 $13,000 - - - $4,740
-
gal
- - -
08 4.423: Move product using mechanical means $66,490 $21,110 - - - - - - $66,490
09 4.711: Initiate a total quality management program $15,600 $9,750 - - - - $15,600 - -
TOTAL RECOMMENDED $89,890 $48,290 $1,310
55,394
kWh
$570
-
kW-mo/yr
$920
-
MMBtu
$4,740
-
gal
$15,780 $80 $66,490
TOTAL IMPLEMENTED $73,140 $35,310 $430
17,879
kWh
$300
-
kW-mo/yr
$920
-
MMBtu
$4,740
-
gal
$180 $80 $66,490
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs