Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,740

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0392 #09 Y:2025 Reduce the pressure of compressed air to the minimum required $1,700 $1,000
MZ0392 #08 Y:2025 Turn off equipment during breaks, reduce operating time $462 $530
MZ0392 #07 Y:2025 Replace existing chiller with high efficiency model $20,181 $62,500
MZ0392 #06 Y:2025 Use solar heat to make electricty $89,166 $755,622
MZ0392 #05 Y:2025 Recover waste heat from equipment $3,904 $10,250
MZ0392 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,559 $500
MZ0392 #03 Y:2025 Install occupancy sensors $130 $460
MZ0392 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,123 $9,500
MZ0392 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,718 $9,190
LT8441 #06 Y:2025 Install equipment (eg compactor) to reduce disposal costs $13,178 $19,400
LT8441 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,016 $245
LT8441 #04 Y:2025 Replace old machine with new automatic multi-station tool $394,200 $2,500,751
LT8441 #03 Y:2025 Install occupancy sensors $2,834 $3,130
LT8441 #02 Y:2025 Use solar heat to make electricty $21,801 $328,991
LT8441 #01 Y:2025 Turn off equipment when not in use $7,201 -
IP0218 #11 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,999 $4,180
IP0218 #10 Y:2025 Replace fossil fuel equipment with electrical equipment $48,200 $100,000
IP0218 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $64,217 $51,340
IP0218 #08 Y:2025 Turn off equipment when not in use $4,427 $2,340
IP0218 #07 Y:2025 Turn off equipment when not in use $10,343 $3,625