ITAC Assessment: LT8441
ITAC logo
ITAC Assessment: LT8441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Titanium tube & Nickel alloys
NAICS 331491: Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding
SIC 3356: Rolling, Drawing, and Extruding of Nonferrous Metals, Except Copper and Aluminum
Sales Range $50
M
to 100
M
# of Employees 204
Plant Area 240,000
ft2
Annual Production 36,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $450,452 12,346,548
kWh
Electricity Demand $446,732 811,935
kW-mo/yr
Waste Disposal Costs
Water Usage $10,796 3,182
Tgal
Water Disposal $207 3,182
Tgal
TOTAL YEARLY COSTS $908,187
RECOMMENDED SAVINGS* $440,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $7,201 - $7,055
193,285
kWh
$146
-
kW-mo/yr
- -
02 2.9114: Use solar heat to make electricty $21,801 $328,991 $21,801
597,282
kWh
- - -
03 2.7135: Install occupancy sensors $2,834 $3,130 $2,714
74,367
kWh
$119
-
kW-mo/yr
- -
04 4.112: Replace old machine with new automatic multi-station tool $394,200 $2,500,751 - - - $394,200
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,016 $245 $1,016
27,833
kWh
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $13,178 $19,400 $(-3.4)
(-95)
kWh
- $(-2,600.0) $15,782
TOTAL RECOMMENDED $440,230 $2,852,517 $32,583
892,672
kWh
$265
-
kW-mo/yr
$(-2,600.0) $409,982
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs