ITAC Assessment: UD0364
ITAC logo
ITAC Assessment: UD0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ALUMINUM CASTINGS
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 188
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $717,148 12,158,851
kWh
Natural Gas $124,294 38,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,121

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $8,100 $20,000 $8,100
-
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $9,728 $3,200 $9,728
360,492
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,314 $90,000 $36,222
612,251
kWh
$(-17,908.0)
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,121 $14,430 $8,121
150,059
kWh
-
TOTAL RECOMMENDED $44,263 $127,630 $62,171
1,122,802
kWh
$(-17,908.0)
-
MMBtu
TOTAL IMPLEMENTED $8,121 $14,430 $8,121
150,059
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs