Assessment Year | 1987 |
---|---|
Principal Product | FRUIT JUICES & VINEGAR |
NAICS |
n/a
|
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $100 M to 500M |
# of Employees | 325 |
Plant Area |
n/a
|
Annual Production | 31,200,000
pieces
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $537,824 | 6,888,042 |
kWh
|
$0.078 |
Natural Gas | $22,365 | 7,573 |
MMBtu
|
$2.95 |
Fuel Oil #6 | $276,517 | 110,002 |
MMBtu
|
$2.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,181 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,034 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $25,545 | $1,275 | - |
$2,378
-
MMBtu
|
$29,407
-
MMBtu
|
$(-6,240.0) | |
02 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $4,668 | $4,050 | - |
$348
-
MMBtu
|
$4,320
-
MMBtu
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,707 | $24,000 | - |
$502
-
MMBtu
|
$6,205
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,453 | $3,862 |
$2,453
31,360
kWh
|
- | - | - | |
05 | 2.3132: Recharge batteries on during off-peak demand periods | $470 | - |
$470
-
kWh
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $5,019 | $15,000 | - |
$375
-
MMBtu
|
$4,644
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,319 | - |
$3,319
42,497
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $48,181 | $48,187 |
$6,242
73,857
kWh
|
$3,603
-
MMBtu
|
$44,576
-
MMBtu
|
$(-6,240.0) | ||
TOTAL IMPLEMENTED | $31,034 | $16,275 |
$470
-
kWh
|
$2,753
-
MMBtu
|
$34,051
-
MMBtu
|
$(-6,240.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs