Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,058

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0356 #07 Y:2023 Clean or color roof to reduce solar load $135,000 $306,035
MZ0356 #06 Y:2023 Use solar heat to make electricty $525,252 $3,450,533
MZ0356 #05 Y:2023 Lower temperature during the winter season and vice-versa $6,120 $2,680
MZ0356 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $11,117 $14,802
MZ0356 #03 Y:2023 Recover waste heat from equipment $29,176 $63,400
MZ0356 #02 Y:2023 Eliminate or reduce compressed air usage $10,731 $440
MZ0356 #01 Y:2023 Install occupancy sensors $519 $415
LE0559 #07 Y:2023 Use / purchase optimum sized compressor $3,104 $20,117
LE0559 #06 Y:2023 Replace existing hvac unit with high efficiency model $15,707 $94,101
LE0559 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $543 $1,850
LE0559 #04 Y:2023 Install an uninteruptable power supply $11,423 $30,000
LE0559 #03 Y:2023 Recycle air for heating, ventilation and air conditioning $7,729 $9,380
LE0559 #02 Y:2023 Install occupancy sensors $704 $450
LE0559 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $768 $100
CM1027 #06 Y:2023 Improve air circulation with destratification fans / other methods $1,407 $16,200
CM1027 #05 Y:2023 Apply for tax-free status for energy purchases $6,778 $2,000
CM1027 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $518 $243
CM1027 #03 Y:2023 Insulate glazing, walls, ceilings, and roofs $21,130 $13,400
CM1027 #02 Y:2023 Replace hydraulic / pneumatic equipment with electric equipment $1,447 $6,935
CM1027 #01 Y:2023 Upgrade controls on compressors $3,978 $1,746