Assessment Year | 2024 |
---|---|
Principal Product | underbody welded assemblies |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
470,000
ft2
|
Annual Production | 298,898
pieces
|
Production Hrs. Annual | 4,704
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,136,953 | 15,550,660 |
kWh
|
$0.073 | |
Electricity Demand | $108,754 | 33,440 |
kW-mo/yr
|
$3.25 | |
Natural Gas | $194,004 | 15,923 |
MMBtu
|
$12.18 | |
Waste Disposal Costs | |||||
Water Usage | $8,027 | 1,538 |
Tgal
|
$5.22 | |
Water Disposal | $16,727 | 1,538 |
Tgal
|
$10.88 | |
TOTAL YEARLY COSTS | $1,464,465 | ||||
RECOMMENDED SAVINGS* | $735,794 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $17,756 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $519 | $415 |
$519
7,113
kWh
|
- | - | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $10,731 | $440 |
$10,731
146,994
kWh
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $29,176 | $63,400 | - |
$29,176
-
MMBtu
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,117 | $14,802 |
$11,117
152,262
kWh
|
- | - | - | - | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $6,120 | $2,680 |
$3,967
54,356
kWh
|
$2,153
-
MMBtu
|
- | - | - | |
06 | 2.9114: Use solar heat to make electricty | $525,252 | $3,450,533 |
$525,252
7,236,330
kWh
|
- | - | - | - | |
07 | 2.7425: Clean or color roof to reduce solar load | $135,000 | $306,035 | - | - | - | - | $135,000 | |
08 | 3.4116: Meter recycled water (to reduce sewer charges) | $7,202 | $7,540 | - | - | - |
$7,202
-
Tgal
|
- | |
09 | 3.4159: Replace treated water with well / surface water | $10,677 | $100,000 | - | - |
$3,448
-
Tgal
|
$7,229
-
Tgal
|
- | |
TOTAL RECOMMENDED | $735,794 | $3,945,845 |
$551,586
7,597,055
kWh
|
$31,329
-
MMBtu
|
$3,448
-
Tgal
|
$14,431
-
Tgal
|
$135,000 | ||
TOTAL IMPLEMENTED | $17,756 | $17,897 |
$15,603
213,731
kWh
|
$2,153
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs