| Assessment Year | 2024 |
|---|---|
| Principal Product | Injection Molded Parts |
| NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 45 |
| Plant Area |
40,000
ft2
|
| Annual Production | 18,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $74,454 | 1,255,544 |
kWh
|
$0.059 |
| Electricity Demand | $16,705 | 3,269 |
kW-mo/yr
|
$5.11 |
| Electricity Fees | $9,517 | - |
|
- |
| Natural Gas | $17,912 | 2,051 |
MMBtu
|
$8.73 |
| TOTAL YEARLY COSTS | $118,588 | |||
| RECOMMENDED SAVINGS* | $39,978 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,472 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $768 | $100 |
$659
11,175
kWh
|
$109
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $704 | $450 |
$704
11,866
kWh
|
- | - | |
| 03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $7,729 | $9,380 |
$7,007
118,761
kWh
|
$722
-
kW-mo/yr
|
- | |
| 04 | 4.631: Install an uninteruptable power supply | $11,423 | $30,000 | - | - | $11,423 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $543 | $1,850 |
$376
6,388
kWh
|
$167
-
kW-mo/yr
|
- | |
| 06 | 2.7232: Replace existing hvac unit with high efficiency model | $15,707 | $94,101 |
$14,079
238,648
kWh
|
$1,628
-
kW-mo/yr
|
- | |
| 07 | 2.4226: Use / purchase optimum sized compressor | $3,104 | $20,117 |
$2,661
45,111
kWh
|
$443
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $39,978 | $155,998 |
$25,486
431,949
kWh
|
$3,069
-
kW-mo/yr
|
$11,423 | ||
| TOTAL IMPLEMENTED | $1,472 | $550 |
$1,363
23,041
kWh
|
$109
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs