ITAC Assessment: CM1027
ITAC logo
ITAC Assessment: CM1027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Rubber Pet Toys
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 38,358
ft2
Annual Production 2,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,495 1,719,481
kWh
Electricity Demand $60,363 5,179
kW-mo/yr
Electricity Fees $25,574 -
Natural Gas $21,891 1,905
MMBtu
TOTAL YEARLY COSTS $236,323
RECOMMENDED SAVINGS* $36,065 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $3,978 $1,746 $3,060
40,964
kWh
$918
-
kW-mo/yr
- -
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,447 $6,935 $634
8,487
kWh
$813
-
kW-mo/yr
- -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $21,130 $13,400 $430
5,800
kWh
- $20,700
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $519 $243 $399
5,338
kWh
$120
-
kW-mo/yr
- -
05 2.8121: Apply for tax-free status for energy purchases $6,778 $2,000 - - - $6,778
06 2.7243: Improve air circulation with destratification fans / other methods $2,213 $16,200 $310
(-4,156)
kWh
$93
-
kW-mo/yr
$1,810
-
MMBtu
-
TOTAL RECOMMENDED $36,065 $40,524 $4,833
56,433
kWh
$1,944
-
kW-mo/yr
$22,510
-
MMBtu
$6,778
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs