ITAC Assessment: GT0695
ITAC logo
ITAC Assessment: GT0695
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cotton Mats / Wool Rugs
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,917 483,880
kWh
Electricity Demand $7,819 2,553
kW-mo/yr
Electricity Fees $6,514 -
Natural Gas $50,969 6,848
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $2,267 - n/a - - - - - $2,267 -
02 4.114: Add/modify equipment to improve drying process $3,232 $900 n/a - - $742
-
MMBtu
- $2,490 - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $700 $450 n/a - - $700
-
MMBtu
- - - -
04 2.4226: Use / purchase optimum sized compressor $888 - n/a $838
-
kW-mo/yr
$50 - - - - -
05 2.1223: Install smaller boiler (increase high fire duty cycle) $14,296 $28,000 n/a - - $14,296
-
MMBtu
- - - -
06 3.5311: Recover and reuse waste material $6,035 $10,000 n/a - - - $6,035
-
lb
- - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $1,980 $1,000 n/a - - - - - - $1,980
08 2.8112: Combine utility meters $15,392 - n/a - - - - - $15,392 -
09 2.2511: Insulate bare equipment $2,000 $5,400 n/a - - $2,000
-
MMBtu
- - - -
TOTAL RECOMMENDED $46,790 $45,750 $838
-
kW-mo/yr
$50 $17,738
-
MMBtu
$6,035
-
lb
$2,490 $17,659 $1,980
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs