ITAC Assessment: UM0313
ITAC logo
ITAC Assessment: UM0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Screw Machine Products
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 40,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,445 1,295,480
kWh
Electricity Fees $6,907 -
Natural Gas $24,259 1,777
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $24,823 - - $24,823
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,498 $9,857 $8,498
83,177
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,655 $225 $5,655
55,315
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,007 $1,100 $2,007
18,584
kWh
-
05 2.2511: Insulate bare equipment $431 $323 $431
4,219
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $56 - $56
546
kWh
-
TOTAL RECOMMENDED $41,470 $11,505 $16,647
161,841
kWh
$24,823
TOTAL IMPLEMENTED $30,478 $225 $5,655
55,315
kWh
$24,823
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs