ITAC Assessment: RU0001
ITAC logo
ITAC Assessment: RU0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product THERMOPLASTIC EXTRUSION
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 105
Plant Area
n/a
Annual Production 53,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,003 1,987,104
kWh
Natural Gas $21,723 3,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,628 $376 $2,628
38,687
kWh
02 2.2514: Cover open tanks $3,290 $200 $3,290
48,066
kWh
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $822 $31 $822
12,016
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,104 - $4,104
60,375
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,551 - $3,551
51,876
kWh
TOTAL RECOMMENDED $14,395 $607 $14,395
211,020
kWh
TOTAL IMPLEMENTED $11,105 $407 $11,105
162,954
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs