Assessment Year | 1991 |
---|---|
Principal Product | COMMERCIAL PRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $95,014 | 1,404,162 |
kWh
|
$0.068 |
Natural Gas | $18,432 | 3,767 |
MMBtu
|
$4.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,711 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $2,922 | $5,000 | - |
$2,922
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $162 | $165 | - |
$162
-
MMBtu
|
|
03 | 2.3191: Use demand controller or load shedder | $1,896 | $10,000 |
$1,896
-
kWh
|
- | |
04 | 2.7229: Air condition only space necessary | $1,554 | $1,000 | - |
$1,554
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $744 | $1,400 | - |
$744
-
MMBtu
|
|
06 | 2.7226: Use computer programs to optimize hvac performance | $1,487 | $1,400 |
$1,487
21,981
kWh
|
- | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $937 | - |
$937
-
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $557 | $640 |
$557
8,206
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $141 | - |
$141
2,052
kWh
|
- | |
10 | 2.7221: Lower temperature during the winter season and vice-versa | $1,311 | - |
$1,311
19,343
kWh
|
- | |
TOTAL RECOMMENDED | $11,711 | $19,605 |
$6,329
51,582
kWh
|
$5,382
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs