| Assessment Year | 2002 |
|---|---|
| Principal Product | blow mold plastics |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
60,000
ft2
|
| Annual Production | 11,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $366,793 | 12,675,840 |
kWh
|
$0.029 |
| Electricity Demand | $315,651 | 27,096 |
kW-mo/yr
|
$11.65 |
| Natural Gas | $962 | 139 |
MMBtu
|
$6.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $164,328 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,457 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,757 | $1,256 |
$3,291
113,499
kWh
|
$2,466
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $3,700 | $264 |
$2,115
72,922
kWh
|
$1,585
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,277 | $688 |
$228
7,862
kWh
|
$2,049
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $347 | $509 |
$347
11,968
kWh
|
- | - | |
| 05 | 4.111: Add equipment/ operators to reduce production bottleneck | $133,875 | $21,450 | - | - | $133,875 | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,372 | $5,765 |
$1,086
37,440
kWh
|
$17,286
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $164,328 | $29,932 |
$7,067
243,691
kWh
|
$23,386
-
kW-mo/yr
|
$133,875 | ||
| TOTAL IMPLEMENTED | $9,457 | $1,520 |
$5,406
186,421
kWh
|
$4,051
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs