Assessment Year | 2002 |
---|---|
Principal Product | blow mold plastics |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
60,000
ft2
|
Annual Production | 11,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $366,793 | 12,675,840 |
kWh
|
$0.029 |
Electricity Demand | $315,651 | 27,096 |
kW-mo/yr
|
$11.65 |
Natural Gas | $962 | 139 |
MMBtu
|
$6.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $164,328 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,457 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,757 | $1,256 |
$3,291
113,499
kWh
|
$2,466
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,700 | $264 |
$2,115
72,922
kWh
|
$1,585
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,277 | $688 |
$228
7,862
kWh
|
$2,049
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $347 | $509 |
$347
11,968
kWh
|
- | - | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $133,875 | $21,450 | - | - | $133,875 | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,372 | $5,765 |
$1,086
37,440
kWh
|
$17,286
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $164,328 | $29,932 |
$7,067
243,691
kWh
|
$23,386
-
kW-mo/yr
|
$133,875 | ||
TOTAL IMPLEMENTED | $9,457 | $1,520 |
$5,406
186,421
kWh
|
$4,051
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs