5,103
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0204 #05 Y:2001 | 05 | 2001 | Install compressor air intakes in coolest locations | $3,268 | $2,000 | |
| BD0204 #04 Y:2001 | 04 | 2001 | Install occupancy sensors | $3,761 | $3,375 | |
| BD0204 #03 Y:2001 | 03 | 2001 | Use radiant heater for spot heating | $5,276 | $11,250 | |
| BD0204 #02 Y:2001 | 02 | 2001 | Reduce the pressure of compressed air to the minimum required | $7,400 | - | |
| BD0204 #01 Y:2001 | 01 | 2001 | Use waste heat from hot flue gases to preheat | $9,982 | $2,000 | |
| MI0027 #05 Y:2001 | 05 | 2001 | Use optimum size and capacity equipment | $6,727 | $1,250 | |
| MI0027 #04 Y:2001 | 04 | 2001 | Recycle white water | $2,639 | $982 | |
| MI0027 #03 Y:2001 | 03 | 2001 | Modify startup/shutdown times | $150,000 | $3,900 | |
| MI0027 #02 Y:2001 | 02 | 2001 | Install or upgrade insulation on hvac distribution systems | $1,410 | $2,000 | |
| MI0027 #01 Y:2001 | 01 | 2001 | Reschedule plant operations or reduce load to avoid peaks | $4,448 | $1,859 | |
| IC0029 #14 Y:2001 | 14 | 2001 | Eliminate old stock and modify inventory control | $102,000 | $8,500 | |
| IC0029 #13 Y:2001 | 13 | 2001 | Modify workload | $150,000 | $32,000 | |
| IC0029 #12 Y:2001 | 12 | 2001 | Install occupancy sensors | $962 | $2,112 | |
| IC0029 #11 Y:2001 | 11 | 2001 | Utilize higher efficiency lamps and/or ballasts | $1,182 | $4,751 | |
| IC0029 #10 Y:2001 | 10 | 2001 | Utilize higher efficiency lamps and/or ballasts | $4,519 | $20,549 | |
| IC0029 #09 Y:2001 | 09 | 2001 | Utilize higher efficiency lamps and/or ballasts | $14,753 | $49,560 | |
| IC0029 #08 Y:2001 | 08 | 2001 | Use demand controller or load shedder | $18,000 | $3,280 | |
| IC0029 #07 Y:2001 | 07 | 2001 | Insulate bare equipment | $1,616 | $906 | |
| IC0029 #06 Y:2001 | 06 | 2001 | Use heat from boiler blowdown to preheat boiler feed water | $36,712 | $36,036 | |
| IC0029 #05 Y:2001 | 05 | 2001 | Analyze flue gas for proper air/fuel ratio | $14,179 | $1,500 |