Assessment Year | 2002 |
---|---|
Principal Product | Corrugated Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
235,000
ft2
|
Annual Production | 6,000
thousand feet
|
Production Hrs. Annual | 4,798
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,806 | 3,776,692 |
kWh
|
$0.036 |
Electricity Demand | $155,500 | 13,225 |
kW-mo/yr
|
$11.76 |
Electricity Fees | $74,393 | - |
|
- |
Natural Gas | $583,090 | 88,511 |
MMBtu
|
$6.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $390,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $89,888 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $1,907 | $3,610 | - | - |
$1,907
-
MMBtu
|
- | - | - | |
02 | 2.7492: Use proper thickness of insulation on building envelope | $9,300 | $1,320 | - | - |
$9,300
-
MMBtu
|
- | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $10,646 | $900 | - | - |
$10,646
-
MMBtu
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,828 | $3,000 |
$14,332
304,958
kWh
|
$10,496
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,179 | $1,500 | - | - |
$14,179
-
MMBtu
|
- | - | - | |
06 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $36,712 | $36,036 | - | - |
$36,712
-
MMBtu
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $1,616 | $906 | - | - |
$1,616
-
MMBtu
|
- | - | - | |
08 | 2.3191: Use demand controller or load shedder | $18,000 | $3,280 | - |
$18,000
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,753 | $49,560 |
$9,017
191,843
kWh
|
$6,602
-
kW-mo/yr
|
- | $(-947.0) | - | $81 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,519 | $20,549 |
$2,139
45,514
kWh
|
$1,566
-
kW-mo/yr
|
- | $121 | - | $693 | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,182 | $4,751 |
$391
8,313
kWh
|
$489
-
kW-mo/yr
|
- | $278 | - | $24 | |
12 | 2.7135: Install occupancy sensors | $962 | $2,112 |
$769
16,366
kWh
|
$193
-
kW-mo/yr
|
- | - | - | - | |
13 | 4.426: Modify workload | $150,000 | $32,000 | - | - | - | $94,000 | $56,000 | - | |
14 | 4.322: Eliminate old stock and modify inventory control | $102,000 | $8,500 | - | - | - | - | $102,000 | - | |
TOTAL RECOMMENDED | $390,604 | $168,024 |
$26,648
566,994
kWh
|
$37,346
-
kW-mo/yr
|
$74,360
-
MMBtu
|
$93,452 | $158,000 | $798 | ||
TOTAL IMPLEMENTED | $89,888 | $45,952 |
$14,332
304,958
kWh
|
$10,496
-
kW-mo/yr
|
$65,060
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs