Assessment Year | 2015 |
---|---|
Principal Product | Bakery Products |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $5 M to 10M |
# of Employees | 140 |
Plant Area |
52,000
ft2
|
Annual Production | 33,770,240
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,484 | 3,446,893 |
kWh
|
$0.045 |
Electricity Demand | $136,169 | 6,454 |
kW-mo/yr
|
$21.10 |
Electricity Fees | $607 | - |
|
- |
Natural Gas | $180,871 | 32,434 |
MMBtu
|
$5.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,740 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,270 | $310 |
$4,350
97,800
kWh
|
$3,920
-
kW-mo/yr
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $4,050 | $4,240 |
$2,130
47,800
kWh
|
$1,920
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,830 | $60 |
$1,490
33,500
kWh
|
$1,340
-
kW-mo/yr
|
- | - | |
04 | 2.2626: Avoid frost formation on evaporators | $1,750 | $1,890 |
$1,750
39,300
kWh
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $900 | $4,090 |
$540
12,100
kWh
|
$360
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,570 | $9,010 |
$2,890
65,000
kWh
|
$2,610
-
kW-mo/yr
|
$60 | $10 | |
TOTAL RECOMMENDED | $23,370 | $19,600 |
$13,150
295,500
kWh
|
$10,150
-
kW-mo/yr
|
$60 | $10 | ||
TOTAL IMPLEMENTED | $14,740 | $13,410 |
$7,780
174,900
kWh
|
$6,890
-
kW-mo/yr
|
$60 | $10 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs