ITAC Assessment: CO0704
ITAC logo
ITAC Assessment: CO0704
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bakery Products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area 52,000
ft2
Annual Production 33,770,240
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,484 3,446,893
kWh
Electricity Demand $136,169 6,454
kW-mo/yr
Electricity Fees $607 -
Natural Gas $180,871 32,434
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,270 $310 $4,350
97,800
kWh
$3,920
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $4,050 $4,240 $2,130
47,800
kWh
$1,920
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,830 $60 $1,490
33,500
kWh
$1,340
-
kW-mo/yr
- -
04 2.2626: Avoid frost formation on evaporators $1,750 $1,890 $1,750
39,300
kWh
- - -
05 2.4133: Use most efficient type of electric motors $900 $4,090 $540
12,100
kWh
$360
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,570 $9,010 $2,890
65,000
kWh
$2,610
-
kW-mo/yr
$60 $10
TOTAL RECOMMENDED $23,370 $19,600 $13,150
295,500
kWh
$10,150
-
kW-mo/yr
$60 $10
TOTAL IMPLEMENTED $14,740 $13,410 $7,780
174,900
kWh
$6,890
-
kW-mo/yr
$60 $10
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs